- Short curing time, walk able to 3 hours after application and the finishing coating can be applied within 2-3 days. Full mechanical strength of the floor coatings after 7 days. - Max thickness of application of one layer up to 100 mm. - Low water content, less shrinkage, less cracks. - Rich product variety, satisfying the needs of all fields of manufacturing.